Before cabinet work begins

Know what Carlos needs from you and what happens after that.

The details change with painting, refacing, repair, or custom work, but every project starts by understanding the cabinets, the home, and the requested result.

Finished white kitchen cabinets with gold handles

The project sequence

From the first photos to the final cabinet adjustments.

This is the general sequence. Your written scope should identify the service, included work, materials, and project-specific timing.

  1. Send photos and project details

    Include wide views, close-ups, your city, the service you are considering, visible damage, and any finish or hardware ideas.

  2. Carlos reviews the existing cabinets

    He looks at the material, construction, wear, layout, doors, drawers, hinges, slides, and areas that may need repair.

  3. Confirm the scope

    Measurements or an on-site review may be needed. The work, selections, exclusions, access, and expected timing should be settled before the project begins.

  4. Prepare and complete the cabinet work

    Protection, removal, repairs, surface work, fabrication, coating, or installation will depend on the approved service.

  5. Reinstall, adjust, and review care

    Applicable doors, drawer fronts, and hardware are installed or adjusted, details are reviewed, and Carlos explains care for the completed work.

Getting the room ready

Carlos will tell you what needs to move before work starts.

The preparation depends on the cabinet service and which surfaces need access. Do not empty or dismantle everything unless it is part of the agreed instructions.

  • Confirm access, parking, work hours, and how Carlos should enter the home
  • Move items Carlos identifies from counters, nearby walls, or cabinet interiors
  • Plan for pets and children to stay away from tools, materials, and protected work areas
  • Set aside selected knobs, pulls, hinges, or other customer-provided items
  • Ask about appliances, sinks, lighting, or other nearby features before disconnecting anything

While work is happening

Expect some limits around the active cabinet area.

Access and protection

Parts of the room may be covered or unavailable while surfaces, cabinet openings, floors, counters, and nearby areas are protected.

Tools, sound, and work space

Repair, preparation, removal, installation, and adjustment can involve tools and temporary work zones. Ask where those areas will be.

Drying and cure time

A painted finish can continue curing after reinstallation. Follow Carlos’s care instructions and treat doors and drawers gently during that period.

Ready to start with photos?

Show Carlos the full cabinet area and the details that concern you.

Add your city, timing needs, and any questions about living with the work.